020 8254 5580

Key Performance Indicators

Checkmate can produce over 250 Key Performance Indicators and Performance Indicators. Some only look at the client perspective, some only at the contactor perspective, but the majority look at both.

 

 

Key Performance Indicators - Description
kpi01aPercentage of emergency orders completed on time
kpi01bPercentage of urgent orders completed on time
kpi01cPercentage of routine orders completed on time
kpi02Percentage appointments made and kept
kpi03Responsive Maintenance expenditure per dwelling per annum incl VAT
kpi03aResponsive Maintenance expenditure per dwelling per annum excl VAT
kpi04Average cost per responsive maintenance repair job incl VAT
kpi04aAverage cost per responsive maintenance repair job excl VAT
kpi05Average number of responsive repair jobs per property per annum
kpi06Number of emergency jobs as a percentage of responsive repairs
kpi07Number of urgent jobs as a percentage of responsive repairs
kpi07aNumber of routine jobs as percentage of response repairs
kpi07bAverage time for completing emergency responsive repairs (hours)
kpi07cAverage time for completing urgent responsive repairs (days)
kpi07dAverage time for completing routine responsive repairs (days)
kpi08Value of planned and cyclical work as a percentage of all work (for client)
kpi09Number of gas check (CP12) certificates outstanding per unit with gas
kpi11aAverage cost of gas servicing and repair per property per annum excl VAT
kpi12Average void relet time (weeks)
kpi12aAverage contractor void period
kpi13Void costs per dwelling pa incl VAT
kpi13aVoid costs per dwelling pa excl VAT
kpi14Average cost per void property incl VAT
kpi14aAverage cost per void property excl VAT
kpi15Voids per 1000 units pa
kpi16Average turnover per operative
kpi17Average operative payroll costs
kpi18Percentage of work for client not done by DLO
kpi19Overhead and procurement costs as % of maintenance spend (client)
kpi20Sub contract work as % total costs (contractor)
kpi21Operative payroll costs as % total costs excluding sub-contracting
kpi22Overhead costs as % total costs excluding sub-contracting
kpi23Management & Support costs as % total costs excl sub-contracting
kpi24Material costs as % total costs excluding sub-contracting
kpi25Plant & vehicle costs as % total costs excluding sub-contracting
kpi26Overhead costs per unit maintained
kpi27Management & Support costs per unit maintained
kpi28Plant & vehicle costs per unit maintained
kpi29Average materials cost per job
kpi30Percentage of DLO turnover on work carried out for others
kpi31Average SAP 2001 rating (as reported on RSR or HIP return)
kpi31aAverage SAP 2005 rating (as reported on RSR or HIP return)
kpi32Change in SAP 2001 rating from previous year
kpi32aChange in SAP 2005 rating from previous year
kpi34Number of properties failing Decent Homes Standard
kpi35Percentage of properties failing Decent Homes standard
kpi36Average days sickness absence - workforce
kpi37Average days sickness absence - Management & Support staff
kpi39Percentage of tenants satisfied with repairs service
 

 

Performance Indicators - Description
pi015Responsive works / unit incl VAT
pi015aResponsive works / unit excl VAT
pi016Voids works / unit incl VAT
pi016a
Share |